New SYSPRO Factory Scheduling Software Options Advance Lean Manufacturing Practices
TMCnet
TMC Launches New Sites ::  NGC  |  4GWE  |  Green Tech  |  Satellite  |  IT |  IVR |  ITEXPO SHOW NEWS  |  Healthcare  |  Cisco News  |  Skype News  |  Microsoft News  |  AVAYA News
  INDUSTRIES
  VERTICALS
  HORIZONTAL
  PUBLICATIONS
  FREE RESOURCES
  INTERNATIONAL
  EVENTS
  ABOUT TMC
  COMMUNITIES
Share
TMCnews
[September 25, 2007]

New SYSPRO Factory Scheduling Software Options Advance Lean Manufacturing Practices

CHICAGO --(Business Wire)-- SYSPRO, a leading producer of enterprise software, has today announced the addition of new scheduling options to the SYSPRO Factory Scheduling Software solution. These options, which range from fairly basic planning board type scheduling to the optimal in advanced scheduling solutions, help factory managers advance Lean manufacturing practices.



SYSPRO Factory Scheduling has three product offerings, which include the SYSPRO Graphical Planning Board, SYSPRO Finite Scheduler and the SYSPRO Advanced Scheduler, allowing companies to choose the level of sophistication required.

The SYSPRO Graphical Planning Board is a basic finite capacity scheduler with limited rules and features for automatic scheduling. The schedule can be manually manipulated using the graphical Gantt chart view.



The SYSPRO Finite Scheduler contains more sophisticated features to schedule a factory. Multiple constraints per operation can now be considered, including machine, tools and labor, as well as numerous other variables. In addition, managers are now able to more accurately schedule the factory using features such as transfer batches, sequence dependent setup times, preferred resource selections, maximum operation spans and maximum delay between operations as well as other variables.

The SYSPRO Advanced Scheduler enables high quality scheduling through the use of advanced scheduling rules and the availability of components and raw materials. Factory managers are now able to define their own complex scheduling rules using filters, a combination of standard and/or user defined advanced rules and user defined scripts as well as other standards. Jobs on different BOM levels and stock on hand can now be pegged based on definable rules, thereby ensuring a feasible schedule.

About SYSPRO

Since its inception in 1978, SYSPRO has been delivering state-of-the-art business solutions to some of the world's leading companies. As a global leader in the production of world-class ERP software, the company now caters to the specialized needs of 12,000 licensed companies in more than 60 countries worldwide. SYSPRO is marketed globally through regional territory distribution centers and a global reseller network in the US, Canada, Africa, Asia Pacific, Australia and the UK.

For more information, please call: 1-800-369-8649 or email Stanley.goodrich@us.syspro.com.

All company names and products mentioned in this release are trademarks or registered trademarks of their respective holders.

[ Back To TMCnet.com's Homepage ]


Discussions:
Be the first to post a comment on this page!
 
By  
TMCnet
TMCnet Videos
Featured White Papers
Top Stories
Related VoIP News

Today @ TMC
Upcoming Events
ITEXPO West 2009
September 1-3, 2009
Los Angeles Convention Center
Los Angeles, CA
4G Wireless Evolution Conference
Collocated with ITEXPO
September 1-3, 2009
Los Angeles Convention Center
Los Angeles, CA
Subscribe FREE to all of TMC's monthly magazines. Click here now.