TMCnet News
SandBOND™ Breaks the Cycle of Sand-Driven Pump Failures in Long-Lateral Horizontal WellsWilliston Basin wells extend pump run life 5.5× and 4.7× with zero production loss after a single bullhead treatment; both pumps continue to operate beyond one year HOUSTON, Oct. 14, 2026 /PRNewswire/ -- TenEx Technologies today announced extended field results demonstrating SandBOND™'s ability to control severe proppant production and protect downhole pumps in long-lateral horizontal wells without sacrificing production.
Chord Energy, a Williston Basin operator, was looking to further decrease pump failures caused by severe proppant production in approximately 10,000-ft lateral wells. Following a single SandBOND™ treatment in two wells, both wells have now operated for more than one year without a sand-related pump failure, with both pumps continuing to run with stable performance. Field Results:
SandBOND™, a non-resin, atomized aluminum-based sand-control technology, is designed to control proppant production while maintaining well productivity. The treatment is bullheaded directly into the well, followed by a 24-hour soak, with no intervention rig, workover, or specialized equipment required. "The combination of sustained pump performance and zero production losses is particularly significant," said Amr Radwan, Co-Founder and CTO of TenEx Technologies. "These results demonstrate that SandBOND™ can control proppant while allowing the well to continue producing effectively." The full case study, "Breaking the Cycle of Sand Production–Driven Pump Failures in Long Horizontal Wells," is available at PumpMoreOil.com. About TenEx Technologies About Chord Energy SandBOND™ is a trademark of TenEx Technologies. Contact: Miguel Peña - [email protected]
SOURCE TenEx Technologies, LLC
|

