|
Another week of road closures, delays in NCW
Jun 06, 2009 (The Wenatchee World - McClatchy-Tribune Information Services via COMTEX) --
Here are the road construction alerts for North Central Washington for the coming week:
Riverside Drive project, Wenatchee
Monday through Friday, 6 a.m. to 5 p.m., Piere Street from Fifth to Ninth streets, intermittent delays with shoulder and intersection closures.
Telephone main line work, Wenatchee
Monday through Friday, 6 p.m. to 6 a.m., one southbound lane closed at Wenatchee Avenue and Maple Street.
Water main work, Wenatchee
-- Monday and Tuesday, 7 a.m. to 5:30 p.m., Hideaway Place closed to through traffic.
Monday and Tuesday, 7 a.m. to 5:30 p.m., Story Lane between Western Avenue and Angela Street closed to through traffic.
Wednesday, 7 a.m. to 5:30 p.m., Angela Street closed to through traffic.
Rumble strip removal, two miles north of Rocky Reach Dam, Highway 97A
Tuesday through Friday, daylight hours, southbound passing lane closed. Two-way traffic will be maintained.
Road repair, Navarre Coulee, Highway 971
Monday through Thursday, 7 a.m. to 3:30 p.m., short delays with single-lane alternating, flagger-controlled traffic.
Emergency flood repair, Blewett Pass, Highway 97
Monday through Thursday, 7 a.m. to 6 p.m., up to 10-minute delays with single-lane, flagger-controlled traffic between the Big Y and the summit. The speed limit through the work zones is 45 mph.
Additional Lane, George Sellar Bridge, Highway 285
Sunday through Friday, 7 p.m. to 6 a.m., traffic restricted to one lane in each direction with a reduced 35 mph speed limit; occasional night closures on approaches.
Pedestrians can't use bridge as sidewalk-removal work continues. They should use the free Link bus service or the pipeline bridge.
The Apple Capital Loop Trail extension south to Hydro Park closed between 9th Street and Grant Road. Detour: Valley Mall Parkway.
Road work, west of Leavenworth, Highway 2
Sunday through Friday, 7:30 p.m. to 6 a.m., the highway is closed to all traffic. No restrictions during the day, on weekends or holidays. Passenger vehicles detoured between Leavenworth and Coles Corner on Highway 207 and the Chumstick Highway. Large trucks must use alternative routes: westbound use Blewett and Snoqualmie passes; eastbound use Snoqualmie.
Unstable slope work, three miles east of Orondo, Highway 2
Monday, several blasts throughout the day, delays less than 30 minutes. Monday through Wednesday, 7 a.m. to 6 p.m., 20-minute delays with single-lane alternating, flagger-controlled traffic. Thursday, work ends at 5 p.m.
Road work, Highway 2, south of Orondo passing lane and Highway 2/97, Lincoln Rock to Orondo
Monday through Thursday, 7 a.m. to 5 p.m., shoulder closures and 20-minute delays with single-lane alternating, flagger-controlled traffic. Speed limit through work zone is 45 mph.
Phone cable repairs, 10 miles west of Coulee Dam, Highway 174
Monday through Thursday, 7:30 a.m. to 4:30 p.m., shoulders closed, some short delays with single-lane, alternating, flagger-controlled traffic.
-- Lori Didricksen, World staff
To see more of The Wenatchee World or to subscribe to the newspaper, go to
http://www.wenworld.com. Copyright (c) 2009, The Wenatchee World, Wash.
Distributed by McClatchy-Tribune Information Services. For reprints, email
tmsreprints@permissionsgroup.com, call 800-374-7985 or 847-635-6550, send a fax
to 847-635-6968, or write to The Permissions Group Inc., 1247 Milwaukee Ave.,
Suite 303, Glenview, IL 60025, USA.
[ Back To TMCnet.com's Homepage ]
|